Skip to main content

What Is a Task?

B
Written by Brayden Woods
Updated today

A Task is a single work item within a job. Tasks let you break a job into steps that can be scheduled and tracked independently.

Key fields

  • Reference number (sequential within the job)

  • Task type

  • Status

  • Origin and destination

  • Preferred days/date

  • Run assignment (if any)

Task types

1) Transport Waste

Move waste from the customer location to your site or another destination
Requirements:

  • At least one waste item assigned

  • Destination required (your site or a pre-defined location)

  • Origin is the job waste origin

2) Drop Off

Deliver assets (bins/containers) to the customer location
Requirements:

  • At least one asset assigned

  • No waste items

  • Origin is your site

  • Destination is the job waste origin

Task status lifecycle

  • UNCONFIRMED (rare)

  • UNSCHEDULED (default)

  • SCHEDULED

  • IN_PROGRESS

  • COMPLETED

  • REQUIRES_REVIEW

  • CANCELLED

Did this answer your question?