A task is a single work item within a job. Tasks break the job into steps that can be scheduled, assigned, and tracked independently.
Task types
Type | Purpose |
Transport waste | Collect waste from the customer site and move it toward drop-off or receival |
Key fields
Reference number (sequential within the job)
Description and tags
Status
Origin and destination (depends on task type)
Allocated waste items
Schedule (preferred date or days, calendar assignment)
Notes and attachments
Task statuses
Typical progression for transport work:
Unscheduled: default; not yet on the calendar
Scheduled: has a scheduled date
Assigned: scheduled with driver and vehicle; collection actions are available
Collected: waste collected; may proceed to drop-off or receival
Dropped Off: drop-off step completed (only when drop-off is enabled for your organisation)
Completed: task finished
Cancelled: task cancelled
Which statuses appear and the order you move through them depend on task type and site configuration (for example, sites without drop-off skip Dropped Off).
Allocation rules (summary)
Every collection item on the job must be allocated to at least one transport waste task.
Non-count items are allocated to one transport task.
Count items can be split across multiple transport tasks.
